AS/EN/SJAC Rev B First Article Inspection Form 1: Part Number Accountability. Sheet of. Form 1. A, B, C, D. 1, 1. Part Number: 2. Part Name: 3. AS/EN/SJAC Rev A First Article Inspection Sheet 1 of _. Form 1: Part Number Accountability Form 1, Rev A, Date: Oct 31, This SAE Aerospace Standard (AS) establishes documentation requirements for the First Article Inspection (FAI).The purpose of the First Article Inspection is to.
Author: | Mocage Vojas |
Country: | Uganda |
Language: | English (Spanish) |
Genre: | Medical |
Published (Last): | 19 October 2014 |
Pages: | 441 |
PDF File Size: | 20.36 Mb |
ePub File Size: | 18.76 Mb |
ISBN: | 872-9-42188-505-1 |
Downloads: | 81702 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Gagul |
The part number accountability form forks specific names, serial numbers, and FAI report numbers for parts used in both the design and manufacturing process. Finally, characteristic accountability evaluates verification and compatibility.
If something goes wrong in the process, the company can look back at the documentation to see exactly which part he needs to change. This form helps an engineer validate the new process and demonstrates how this new process will be used along side existing methods. The three AS forms are: There are several advantages to companies adhering to this new standard. Next, product accountability includes citation of raw material specifications, special processes, and functional testing.
Examples of optional information include the name of the person who prepared the FAI, the name of the person who approved the FAI, the date FAI is reported, and the name of the customer who approved everything.
Get FREE AS Forms for FAI | DISCUS Software
Filling out and tracking these forms help companies ensure validity and reliability when introducing new parts. This new revision was meant to consolidate multiple requirement forms as well as forks the process and organization of these forms.
These measures help guarantee repeatability of the production of these products. With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand which sections of the form must one complete before submitting it. Requirements for AS With all the specifications listed in the AS revision, and all the different fields that this form covers, it might seem difficult to understand fkrms sections of the form must one complete before submitting it.
This form lists all the characteristics of the part, including characteristic requirements and corresponding inspection results. Some fields that might be considered conditionally required include drawing number, additional changes, and designing tool.
The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields. Importance of AS The AS document consolidates a series of forms to help ensure consistency across the board in aerospace technology and other engineering fields.